Difference between revisions of "Written Feedback"
From Ameise-en
m (moved Evaluation in written form to Written Feedback) |
|||
Line 1: | Line 1: | ||
− | The following figure shows an analysis in written form. The | + | The following figure shows an example for an analysis in written form. The required objective «'''Budget'''» was chosen as an evaluation criterion. The figure shows exactly if the trainees project is still within the planned budget. |
Revision as of 13:58, 26 March 2013
The following figure shows an example for an analysis in written form. The required objective «Budget» was chosen as an evaluation criterion. The figure shows exactly if the trainees project is still within the planned budget.
File:Auswertung text.jpg
The target «Budget» as an evaluation criterion.