Classification of the Evaluation Criteria
From Ameise-en
Jump to navigationJump to search
ein oder mehrere Links fehlen |
Based on various evaluation criteria it is possible to start evaluations during and at the end of a simulation run. These evaluations are useful to analyse the project progress. Some evaluation criteria such as the "Expense over all phases" are only make sense at the end of the simulation run.
The following table shows all realized evaluation criteria. Therefore, the evaluation criteria have been combined to areas covering similar criteria.
Results | |
Completness of documents | |
Residual error of documents | |
Efficiency of Reviews or Tests | |
Effectiveness of Reviews | |
Losses by Reviews or Tests | |
Expense allocation | |
Authors of documents |
Evalations at the end of a simulation run
At the end of this chapter,you will see here various reports,that can be started during or at the end of the simulation run.
- Possible evaluation >> Animation (Viewlet)