Using the Simulator: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{NavigatorBar|User interface of the AMEISE-client|The simulation with the component “SimulationPlus”}} | {{NavigatorBar|User interface of the AMEISE-client|The simulation with the component “SimulationPlus”}} | ||
===Starting a new SimulationRun=== | ===Starting a new SimulationRun=== | ||
Line 37: | Line 39: | ||
====Execution of the simulation==== | ====Execution of the simulation==== | ||
The simulation can be executed by the trainee with the '''SimulationPlus-Component'''. | The simulation can be executed by the trainee with the '''SimulationPlus-Component'''. | ||
{{NavigatorBar|User interface of the AMEISE-client|The simulation with the component “SimulationPlus”}} | {{NavigatorBar|User interface of the AMEISE-client|The simulation with the component “SimulationPlus”}} |
Revision as of 19:19, 3 May 2013
Starting a new SimulationRun
If you start a new Simulation Run , a «Proceed» is executed automatically. |
Thus the model leads through intitializations that are absoutely necessary.Commands,which are entered before this Proceed are not exectued by the simulator. A saved simulation run can be continued without executing a Proceed!
Input of commands
Projects can be performed from trainees by entering commands via the surface of the simulation component. The trainee recieves feedback in form of messages from the system. For example a trainee can instruct the developer to create the specification by entering the command Specify.
The simulator returns, that the developer has started this acitvity. After some steps in time with entering Proceeds the system answers that
the developer has finished the specification.
Step in time during the Project
There are two possibilities to go further in the project:
- Step in time of one day
- Step in time of several days
Step in time of one day
To step in time of one day you can click on the «Proceed» button. If you click on this button the project will proceed to the next day what means that the status of the next day will be calculated.
Step in time of several days
If the trainee wants to increase the project time by several days, it is possible to enter the desired number of steps in the field«Number of steps».Afterwards please click on the button «Proceed», to increase the project time by the chosen number of days. Every feedback, that occures during this time will be displayed in the simulation window. You can see older confirmations by using the scroll bar.
Execution of the simulation
The simulation can be executed by the trainee with the SimulationPlus-Component.