Written Feedback

From Ameise-en
Revision as of 18:01, 21 March 2013 by Chriz90 (talk | contribs)
Jump to navigationJump to search

The following figure shows an analysis in written form. The target «Budget» was chosen as an evaluation criterion. The figure shows exactly if the trainees project is still within budget.


File:Auswertung text.jpg
The target «Budget» as an evaluation criterion.