The QA - Model

From Ameise-en
Revision as of 21:32, 9 May 2013 by Chriz90 (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


The QA - Model is the first fully developed model, that is used for SESAM - Simulation. The model is focused on the development of software for small to medium projects. To be precise it is primary focused on quality assurance measurements and therefore the model is called Quality Assurance - Model (QA - Model).

The QA - Model requires a proper procedure from trainees for filling vacancies as well as the progress and quality control. The analysis, the specification, the coarse and fine design, code, and the manual as well as the integration and delivery of the system have to be performed. In addition, all documents have to be reviewed. Module, integration, system and acceptance tests also have to be performed. Trainees are also responsible for hiring employees, assign tasks to them and release them.


All of this is carried out under the model, depending on time and within the budget!


Waterfall Model

The Waterfall Model was chosen and has been extended by additional structural and analytical measures. The model leaves it to the trainees to decide in which order they perform the various activities. Possible procedures in the QA - Model are shown in the following figure:


Possible Procedures in the QA - Model


The dashed arrows between the activities indicate that trainees do not have to act according to the waterfall model. While there is a predefined sequence between the phases, the trainees are not forced to act like that.


Code-and-Fix Approach

However, the trainees are at least forced to create an Analyzing Document and to do the Implementation . All other phases between analysis and implementation can be skipped. Thus, trainees can not be deterred from trying the Code-and-Fix approach.

Furthermore Rollbacks to previous phases are possible, as long as the respective document , still contains errors.


Documents with remaining errors can be checked and corrected as often as necessary!


It is important that the correction of a review has to be successfully completed before a new examination of the same document can be performed. As many activities as needed can be performed, after correcting the documents.