Classification of the Evaluation Criteria: Difference between revisions

From Ameise-en
Jump to navigationJump to search
No edit summary
No edit summary
Line 44: Line 44:


{{NavigatorBar|Die Auswertungskomponente|Literatur}}
{{NavigatorBar|Die Auswertungskomponente|Literatur}}
[[de:Klassifikation der Bewertungskriterien]]
[[en:Classification of the evaluation criteria]]
<!--
[[sk:Hlavná stránka]]
[[fr:Accueil]]
-->


[[Category:Tutorial]]
[[Category:Tutorial]]
__NOTOC__
__NOTOC__
__NOEDITSECTION__
__NOEDITSECTION__

Revision as of 13:40, 12 April 2013


Based on various evaluation criteria it is possible to start evaluations during and at the end of a simulation run. These evaluations are useful to analyse the project progress. Some evaluation criteria such as the "Expense over all phases" are only make sense at the end of the simulation run.

The following table shows all realized evaluation criteria. Therefore, the evaluation criteria have been combined to areas covering similar criteria.


Pin.gif Results
Pin.gif Completness of documents
Pin.gif Residual error of documents
Pin.gif Efficiency of Reviews or Tests
Pin.gif Effectiveness of Reviews
Pin.gif Losses by Reviews or Tests
Pin.gif Expense allocation
Pin.gif Authors of documents
For more information please click on the individual entries


Evalations at the end of a simulation run

At the end of this chapter,you will see here various reports,that can be started during or at the end of the simulation run.